Project

Development and Field Testing of a Tri-Generation Pyrolysis (TGP) System for Low-cost, Clean Hydrogen Production

The project will develop and demonstrate a novel pulse methane pyrolysis (PMP) system for low-cost, clean, industrial H2 production.  The project will also demonstrate a direct carbon fuel cell (DCFC), which converts solid by-product carbon from the PMP process to electrical power and enhances the economics of hydrogen production.  The resulting tri-generation pyrolysis (TGP) platform […]

Project

Innovative Integration of Carbon Capture for Clean Power

Reliable power is becoming increasingly important in Alberta’s evolving power market. Heartland Generation Ltd. will evaluate the feasibility of converting its natural gas-fired Battle River Generating Station to hydrogen, producing electricity with zero emissions, and strengthening Alberta’s power grid. The study will work with vendors to push the performance envelope of clean fuel technology, set […]

Project

SCC FGR on gas turbine with mole sieve CCS

Strathcona Resources, in collaboration with Solar Turbines and Caterpillar Low Carbon Solutions, intends to build a commercial-scale demonstration of a Semi-Closed-Cycle (SCC) Flue-Gas-Recirculation (FGR) technology combined with a molecular sieve to effectively capture and store carbon. This technology will be applied on a gas turbine cogeneration system at our Lindbergh thermal oil facility near Cold […]

Project

Heavy-Duty Hydrogen Fueling Station in Alberta Transport Corridor

To help build Alberta’s hydrogen ecosystem, HTEC will design, build, own, and operate a first-of-kind permanent hydrogen refueling station. This project plays a significant role in addressing limited hydrogen fueling options in the province and connects Alberta’s abundant hydrogen production to vehicles and end-users. Located on Highway 2 in Crossfield – a busy transportation route […]

Project

Implementation of Industrial Heat Pump for Waste Heat Recovery and Gas Fired Boiler Elimination

CSV Midstream will be deploying the first gas processing facility in Alberta to implement an industrial heat pump, marking a significant step in sustainable thermal energy management. Scheduled for installation and commissioning in 2025, the 5.5 MW heat pump system will fully replace the existing natural gas boiler, effectively eliminating greenhouse gas (GHG) emissions. The […]

Project

Field Validation for In-situ Upgrading Technology (ISUT™)

NanosTech’s In-Situ Upgrading Technology (ISUT™) is a novel, patented nanocatalyst process that improves upon existing oil recovery methods while simultaneously enhancing the quality of the sales of oil. ISUT™ empowers heavy oil producers to increase both their environmental performance and economic returns. ISUT™ provides enhanced oil recovery, by both increasing production rates by up to […]

Page

Application process for Capital Retrofits

Capital Retrofits waitlist open Effective March 2, 2026 Due to high demand, Capital Retrofits applications submitted after March 2, 2026, will be placed on a waitlist. Should additional funding become available, applications will be reviewed under evaluation criteria, with priority given to the highest-scoring projects. Projects deemed eligible but not awarded funding within the fixed intake period from January 7 […]

Page

Capital Retrofits

Capital Retrofits waitlist now open Due to high demand, Capital Retrofits applications submitted after March 2, 2026, will be placed on a waitlist. Applications will be reviewed based on select evaluation criteria should additional funding become available. Capital Retrofits Industrial and manufacturing facilities can receive funding to invest in energy efficiency focused capital retrofits for their facilities if […]

Page

Frequently Asked Questions

Last updated: April 1, 2026